Murphy's Celltech Logo
  (802) 748-5800
Contact Us Links

Cavendish Town Elementary School

 

General Contractor: H.P. Cummings Construction Company

 

Thermal Envelope Specialist: Murphy’s CELL-TECH

 

 

            Murphy’s CELL-TECH was responsible for the Thermal Insulation of the new addition and the attic of the pre-existing building, as well as establishing the Air-Barrier Integrity of both  buildings' shells.   The difference in  roof icing before and after the insulation was installed can be seen in the two sets of winter pictures.