Cavendish Town Elementary School
General Contractor: H.P. Cummings Construction Company
Thermal Envelope Specialist: Murphy’s CELL-TECH
Murphy’s CELL-TECH was responsible for the
Thermal Insulation of the new addition and the attic of the pre-existing
building, as well as establishing the Air-Barrier Integrity of both buildings'
shells. The difference in roof icing before and after the insulation was
installed can be seen in the two sets of winter pictures.